Posted by & filed under Case Studies

Partner: Kraft Construction The necessary improvements required the gutting and rebuilding of the tenant space. The project required demolition and relocation, rerouting of complex duct work, and relocating of HVAC controls. Project Manager, Janet Cole, said that she chose Conditioned Air because she had heard good things about them. She was particularly impressed with their… Read more »

Posted by & filed under Case Studies

Partner: Professional Building Systems (PBS) As with many relatively complex construction and remodeling projects, the architectural drawings did not match precisely with the actual structure we encountered. We were able to work collaboratively with PBS to make sure that everything was located where it belonged, even when it did not match the original architectural plan…. Read more »

Posted by & filed under Air Conditioning Installation, Case Studies

Partner: Kraft Construction We faced a difficult challenge for a large estate in Naples which involved the conversion from a water cooled condenser system to geothermal. The estate was more than 13,000 square feet and had 10 separate air conditioners with multiple zones. We worked with the team at Kraft Construction on a system that… Read more »